2015
Integrated project for a large public hospital aimed at optimizing energy efficiency and reducing operating costs.
Participation in the Preliminary Design to Executive Design phases.
Alignment of results with Architecture and other disciplines to ensure the inclusion of efficiency measures in projects
Reduction of the installed Air Conditioning load by 24%;
Guaranteed thermal comfort with natural ventilation in an area of 4,000 m²;
Evaluation of solar water heating and electricity generation systems.
Combating Climate Change
Click here to see the full project portfolio