Hospital Project Assisted by Energy Simulation

2015

Challenge

Integrated project for a large public hospital aimed at optimizing energy efficiency and reducing operating costs.

Mitsidi Performance

Participation in the Preliminary Design to Executive Design phases.

Alignment of results with Architecture and other disciplines to ensure the inclusion of efficiency measures in projects

Results

  • Reduction of the installed Air Conditioning load by 24%;

  • Guaranteed thermal comfort with natural ventilation in an area of 4,000 m²;

  • Evaluation of solar water heating and electricity generation systems.

mitsidi logo icon

Clients

spbr
prefeituraSaoBernardo

Gallery

hospital_gallery
hospital_gallery
Related items
Energy Management for Public Buildings in Guadalajara-MX

Combating Climate Change

Training courses in electric mobility and distributed generation in Panama

Combating Climate Change

Performance contract technique in food retail chain - GreenYellow

Combating Climate Change

Complete portfolio
Portfolio

Click here to see the full project portfolio